It looks like this from the start.

So I start to get rid of the tiles.

Next step it the plastic carpet.

And the plaster boards.

At the same time I install the shower room in my other toilet temporary.

And when we lift the washing machine so did the balance wheel fell at the floor.

Damn, I have to pick up a set of new machines.

At the other toilet it start getting nice and clean.

A new shower well.

 

New interior walls.

We put in a heated floor before we poured out the floating filler.

Next step is the moisture barrier.

Time to unbox the tiles.

And get them at the walls.

And here is how it looks when it's finished.